Back to jobs
Closed
Move Kid’s Play Structure from Cupertino to Half Moon Bay
Job Description
This job involves moving a plastic kid’s play structure. The structure is not heavy but is bulky. It consists of two larger pieces that detach from a small plastic bridge in the middle. The task includes picking up the play structure in Cupertino and transporting it to a daycare in Half Moon Bay, where the pieces need to be reassembled by snapping them together. This is likely a two-person job unless a dolly is available.


Pickup & Dropoff Locations
Posted By

Vicki
Job creator
Interested in this job?
Send a quote and connect with the customer